Fire Protection - Projects

Our company provides a turnkey package in fire engineering and construction to our clients, which are services from consultation to supply and installation to servicing and maintenance. The services we provide for our clients ranges from Design of Fire Safety Strategy and Means of Escape Design (Evacuation Plan), Acquisitions of Fire Certificates, Renewal of Fire Certificates, Supply, Installation and Maintenance of ALL fire safety equipment.

We provide below a catalogue of some of the relevant services carried out that best illustrate our qualifications in FIRE PROTECTION ENGINEERING:

ECOBANK HEAD OFFICE (Square Area: 26,000m²) Installation of Sprinkler and Fire Protection Works 

 

CAL BANK CORPORATE HEAD OFFICE(Square Area: 15,000m²) Suppy and Installation of Fire fighting

GHANA AIRPORT CARGO CENTRE(Square Area: 10,000m²) Installation of Fire Sprinkler System

FIDELITY HEAD OFFICE ANNEX(Square Area: 9,000m²) Installation of Fire Alarm, Fighting, Automatic Fire Suppression and Mechanical Smoke Ventilation System

GHANA INSTITUTE OF MANAGEMENT AND PUBLIC ADMINISTRATION GIMPA

  • Supply and Installation of Fire Detection and Suppression System
  • Narrative Description of Assignment
  • The project is for the purpose of installing fire detection and suppression system for the data centre  of the Ghana institute of management and public administration
  • Country: Ghana

POLY GROUP

  • Installation of fire alarm system and firefighting system at PolyKraft. Fire Safety Audit- Poly Tank and Poly Recycling
  • Narrative Description of Assignment
  • The Project was for the purpose of installing fire alarm system to detect and limit the outbreak of fire in the polykraf office as well as emergency lights in the factory floor. It also involved conducting fire safety audit for Poly Tank and Poly Recycling
  • Country: Ghana                                  Location within Country: Tema & Accra    
  • Number of Premises: 3                        Address: Spintex Road    
  • Start Date : May,2011                         Completion Date: Completed    

 

BANK OF AFRICA

Installation of Fire Alarm System for Head office, Acquisition of fire Certificate, Installation of fire safety equipment and Servicing and Maintenance of Fire Safety Equipment for the rest of Branches   .

 

  • Narrative Description of Assignment
  • The Project is for the purpose of designing a comprehensive fire engineering plan, supply and install fire equipment to limit the outbreak of fire in the Bank and annually maintain all fire alarm and firefighting equipment
  • Country: Ghana
  • Location within Country: Accra and Kumasi    
  • Name of Client: Bank Of Africa
  • Number of Branches: 16 Branches
  • Address: Farrah Avenue, Assylum Down, Accra    
  • Start Date : June,2009    
  • Completion Date: On Going Contract    

 

BARCLAYS BANK LTD

  • Installation of Fire Alarm Systems
  • Narrative Description of Assignment
  • This project was to install fire alarm system to detect fire and warn occupants of the outbreak of fire in the Bank and annually maintain all fire alarm equipment
  • Country: Ghana
  • Location within Country: Nationwide    
  • Number of Premises: 29 Branches  
  • Address: Ghana House, Accra.    
  • Start Date : June,2011    
  • Completion Date: September, 2011    

 

HALLIBURTON LTD

Fire Alarm Installation and Acquisition of fire Certificate for Halliburton’s site in Takoradi.

Narrative Description of Assignment
The Project is for the purpose of acquiring fire certificates for all Halliburton, supply and install fire safety equipment to limit the outbreak of fire in their offices, Warehouse and Workshop.
Description of Actual Service Provided by the Company
Our company was contracted to design the fire engineering plans and prepared a comprehensive proposal report to the Ghana National Fire Services for Acquisition of Fire Certificate for the premises. We were contracted to supply and install the fire equipment proposed in the fire engineering plans and annually maintain all fire alarm and firefighting equipment

  • Country: Ghana
  • Location within Country: Takoradi    
  • Number of Premises: 1
  • Address: Merban House, Accra.    
  • Start Date : February,2012    
  • Completion Date: February, 2012    

 

GHANA COCOA BOARD

Installation of Fire Alarm and Fire Fighting Equipment

Narrative Description of Assignment
The Project is for the purpose of installing fire alarm system to detect and limit the outbreak of fire in the office building. We were also contracted to install fire hydrants as well as fire extinguishers for the Cocoa Distribution warehouses in Kaase Kumasi

  • Location within Country: Kaase, Kumasi    
  • Number of Premises: 1
  • Address: Cocoa House, Accra.    
  • Start Date : May,2011    
  • Completion Date: September, 2011

 

GHANA ATOMIC ENERGY COMMISSION

Installation of Addressable (Intelligent) fire alarm system.

Narrative Description of Assignment
The Project is for the purpose of installing addressable fire alarm system to detect and limit the outbreak of fire in the office building and annually maintain all fire alarm system

  • Country: Ghana
  • Location within Country: Kwabenya, Accra    
  • Number of Premises: 1
  • Address: Atomic Energy, Accra.    
  • Start Date : June,2011    
  • Completion Date: On Going Contract    

 

ECG ACCRA EAST

Installation of Addressable (Intelligent) fire alarm system.

Narrative Description of Assignment
The Project is for the purpose of installing addressable fire alarm system to detect and limit the outbreak of fire in the office building and annually maintain all fire alarm system

  • Location within Country: Accra    Number of Premises: 1
  • Address: ECG Accra East, Accra.    Number of Storeys; 3
  • Start Date : June,2011    
  • Completion Date: On Going Contract    

 

INSTITUTE OF PROFESSIONAL STUDIES (IPS) ADMINSTRATION BLOCK

Installation of Addressable (Intelligent) fire alarm system.

Narrative Description of Assignment
The Project was for the purpose of installing addressable fire alarm system to detect and limit the outbreak of fire in the new administration block and annually maintain all fire alarm system

 

  • Location within Country: Madina, Accra    
  • Number of Premises: 1
  • Address: IPS, Accra.    
  • Number of Storey: 3
  • Start Date : August,2011    
  • Completion Date: Completed    

 

SIC-LIFE

Design, supply and installation of FM 200 automatic fire suppression system for the companies Server room at its Head Office. Installation of Fire Alarm Systems for the Head Office Building.

Narrative Description of Assignment
The Project is for the purpose of design and installation of fire suppression system for the Server Room. It is involved the installation of Fire Alarm systems for the company’s offices.

  • Country: Ghana
  • Location within Country: Head Office     
  • Number of Premises: 1
  • Address: Accra.    
  • Start Date : June,2012    
  • Completion Date: On Going Contract    

 

GHANA COLLEGE OF PHYSICIANS AND SURGEONS

Design, supply and installation of FM 200 automatic fire suppression system for the College’s Server room

Narrative Description of Assignment
The Project is for the purpose of design and installation of fire suppression system for the College’s Server Room.

  • Country: Ghana
  • Location within Country: ACCRA    
  • Number of Premises: 1,
  • Address: Ridge, Accra.    
  • Start Date : December,2012    
  • Completion Date: January, 2012    

 

STANBIC BANK GH LTD

Design, supply and installation of FM 200 automatic fire suppression system for the bank’s UPS room and Server room at its Head Office. Servicing and Maintenance of Fire Extinguishers.

Narrative Description of Assignment
The Project is for the purpose of design and installation of fire suppression system for the banks UPS and Server Rooms. It is involved servicing and maintenance of fire extinguishers as well as renewal of fire certificates for all branches.

  • Location within Country: Head Office and Nationwide    
  • Number of Premises: 22 Branches, 2 Guest Houses and 1 Archives
  • Address: Valco House, Accra.    
  • Start Date : June,2010    
  • Completion Date: On Going Contract    
     

OPPORTUNITY INT. SAV & LOANS LTD

Design, supply and installation of FM 200 automatic fire suppression system for the bank’s Server room.  

Narrative Description of Assignment
The Project is for the purpose of design and installation of fire suppression system for the banks Server Room.

  • Country: Ghana
  • Location within Country: ACCRA
  • Address: Makola, Accra.
  • Start Date :
  • October,2010    
  • Completion Date: October, 2012

 

NATIONAL BLOOD CENTRE- KORLE-BU

Installation of fire fighting system

Narrative Description of Assignment
The Project was for the purpose of installing firefighting system to limit the spread of fire in the Blood Centre.

  • Country: Ghana
  • Location within Country: Korle- Bu, Accra    
  • Number of Premises: 1
  • Address: Korle-Bu    
  • Number of Storey: 3
  • Start Date : April,2012    
  • Completion Date: On-going    

 

AZAR CHEMICAL INDUSTRIES

Fire Fighting Installations

Narrative Description of Assignment
The Project is for the purpose of installing firefighting facilities such as Hose Reels, Landing Valves and Fire Hydrants for the Head Office of Azar Chemical Industries.

  • Country: Ghana
  • Location within Country: Accra
  •     
  • Number of Premises: 1
  • Address: Spintex, Accra    
  • Number of Storeys: 5
  • Start Date : January,2012    
  • Completion Date: On Going Contract    

 

MANSELL

Installation of Fire Protection Equipment

Narrative Description of Assignment
The Project is for the purpose of installing fire alarm systems & firefighting facilities such as Hose Reels, Landing Valves and Fire Hydrants for an Office Complex.

  • Country: Ghana
  • Location within Country: Tema    
  • Number of Premises: 1
  • Address: Tema, Meridian Road    
  • Number of Storeys: 5
  • Start Date :May,2013    
  • Completion Date: On Going Contract    

 

GOLDEN STAR WASA MINING

Installation of Deluge Fire Sprinkler System Over Gas Tanks

Narrative Description of Assignment
The Project is for the purpose of designing and installing pipe networks to deluge sprinkler heads to provide protection of the Gas Tanks.

  • Country: Ghana
  • Location within Country: Wassa Acheampim,     
  • Number of Places: 2
  • Address: Western Region    
  • Start Date : January,2013    
  • Completion Date: March, 2013    

 

ADM COCOA GH LTD

Installation of 10 Fire Hydrants and servicing of Fire Extinguishers

Narrative Description of Assignment
The Project is for the purpose of installing pipe network to connect 10 fire hydrants for the premises of the factory. It also involves the servicing and maintenance of Fire Extinguishers for both the factory and the Bean Warehouse.

  • Location within Country: Kaase, Kumasi    
  • Number of Premises: 1
  • Address: Kaase, Kumasi    
  • Start Date : May,2013    
  • Completion Date: On Going Contract    

 

  • CAPE COAST UNIVERSITY

Installation of firefighting system

Narrative Description of Assignment
The Project was for the purpose of installing firefighting system to limit the spread of fire in the lecture block of Cape Coast University, Accra Campus.

  • Location within Country: Ashaley Botway, Accra    
  • Number of Premises: 1
  • Address: Ashaley Botway, Accra    
  • Number of Storey: 3
  • Start Date : November,2012    
  • Completion Date: On-going    

 

CENTRAL UNIVERSITY COLLEGE

Installation of fire fighting, fire alarm and automatic fire suppression system

Narrative Description of Assignment
The Project is for the purpose of installing firefighting, fire alarm and automatic fire suppression system for both lecture and faculty blocks

 

  • Country: Ghana
  • Location within Country: Miotso, Accra    
  • Number of Premises: 2
  • Address: Miotso, Accra    
  • Number of Storey: 4
  • Start Date : September,2012    
  • Completion Date:On-going    

 

ALISA HOTEL

Installation of Fire Protection Equipment

Narrative Description of Assignment
The Project is for the purpose of installing firefighting facilities such as Hose Reels, Landing Valves and Fire Hydrants for the second phase of Alisa Hotel.

  • Country: Ghana
  • Location within Country: Ridge, Accra    
  • Number of Premises: 1
  • Address:Ridge, Accra    
  • Number of Storeys: 7
  • Start Date :August,2014    
  • Completion Date:December, 2014    

 

GHANA STANDARDS AUTHORITY

Installation of Fire Alarm & Fighting System

Narrative Description of Assignment
The Project is for the purpose of installing complete fire protection systems such as fire alarm, emergency lighting, and firefighting facilities such as Hose Reels, Landing Valves and Fire Hydrants

  • Country: Ghana
  • Location within Country: Tesano, Accra    
  • Number of Premises: 1
  • Address: Ridge , Accra    
  • Number of Storeys: 8
  • Start Date :September,2014    
  • Completion Date: On Going Contract    

 

TEMA SHOPPING CENTRE (TDC)

Installation of Fire Alarm and Fire Fighting Systems

Narrative Description of Assignment
The Project is for the purpose of installing complete fire protection systems such as fire alarm, and firefighting facilities such as Hose Reels, Landing Valves and Fire Hydrants for the Shopping Centre for Tema Development Corporation (TDC).

  • Country: Ghana
  • Location within Country: Tema,    
  • Number of Premises: 1
  • Address: Tema Community 2    
  • Number of Storeys: 8
  • Start Date : September ,2013    
  • Completion Date: On Going Contract    

 

PROCREDIT SAVINGS AND LOANS

Installation of Fire Alarm, Fighting, Automatic Fire Suppression and Mechanical Smoke Ventilation System

Narrative Description of Assignment
The Project is for the purpose of installing complete fire protection systems such as fire alarm, emergency lighting, fire safety signage and firefighting facilities such as Hose Reels, Landing Valves and Fire Hydrants for the Head Office of Procredit Savings and loans Ltd.

  • Country: Ghana
  • Location within Country: Tesano, Accra    
  • Number of Premises: 1
  • Address: Airport Residential, Accra    
  • Number of Storeys: 10
  • Start Date :February,2013    
  • Completion Date: On Going Contract